Total Pond LLUV1050 Installationsanleitung Seite 3

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 7
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 2
3
4. Place the pump into the water and connect to a proper power
source. Fig. 4
Fig. 4
5. Note the indicator light on the back of the pump. This light
indicates whether or not the UV light is on or off. Fig. 5
Fig. 5
MA
I
NTENANCE PROCEDURE
In order to insure optimal operation of the UV pump, the following procedures should be performed
periodically. When the performance of the pump is reduced – it is an indication that cleaning of the unit
is needed.
1. Unplug pump, remove from pond. Fig. 6
Fig. 6
2. Untie the drawstring on the pump barrier bag and then remove the
pump from the pump barrier bag. Clean the pump barrier bag then
place the pump back inside the pump barrier bag and test the pump.
Fig. 7
NOTE: If the pump performance is still unsatisfactory, unplug the
pump and proceed to step 3.
Fig. 7
GFCI
Untie
drawsting
Indicator
light
Seitenansicht 2
1 2 3 4 5 6 7

Kommentare zu diesen Handbüchern

Keine Kommentare